Interventek Subsea Engineering will supply its in-riser Revolution well intervention valve to Professional Rental Tools (PRT) LLC. The companies signed a two-year exclusive deal, according to a recent press release. The valve, for well intervention in the US Gulf of Mexico, will be supplied during the summer of 2017.
With the Revolution valve added, the deep-water, high-working pressure system will allow for cut wire or coiled tubing to go into the well and will provide a seal after the cut. The valve has pump-through capability to ease well-kill operations, the press release said.