TechnipFMC has been awarded an Engineering, Procurement, Construction and Installation (EPCI) contract by Statoil. It covers the execution of the subsea pipeline connection for the new production platform in Peregrino Phase II Project, located in Campos Basin, offshore Brazil. This new fixed platform will be connected by the in-field lines to the existing platform.
TechnipFMC will be responsible for the overall execution for engineering, procurement, manufacturing, construction, installation and pre-commissioning of the rigid pipelines, flexible lines and the required subsea equipment. The offshore campaign is scheduled to start in 2019.