Tag: regulations
Danfoss Introduces New EVR and NRV Solutions
Danfoss announces the release of its new and reliable EVR and NRV Safety Valves, approved to meet UL 60335-2-40 and UL 60335-2-89 standards.
The Role of an SME in Technical Standards Management: An Interview...
Developing and maintaining technical standards up-to-date and in compliance with the applicable regulations is a crucial part of the management system of any energy industry operator.
US PHMSA Proposes New Pipeline Valve Regulations
The US Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA) has proposed revised federal pipeline safety regulations that will require the installation of remotely controlled or automatic shutoff valves on certain pipelines.The published Notice of Proposed Rulemaking is for certain newly constructed or entirely replaced natural gas and hazardous liquid pipelines.
New refinery regulations in California
US state agencies have recently announced final approval of new regulations to strengthen workplace and environmental safety at oil refineries across California.
US proposes new offshore well equipment rules
The US Department of Interior has proposed new rules for the design and operation of well control equipment offshore.
The department has stated that these proposed new rules would incorporate the latest industry standards that establish minimum baseline requirements for the design, manufacture, repair and maintenance of blowout preventors (BOPs); require more controls over the maintenance and repair of BOPs; require that shear rams be designed to include a technology that allows the drill pipe to be centered during shearing operations; require more rigorous third-party certification of the shearing capability of BOPs; request comments on a potential long-term requirement that a technology be installed to allow all equipment in the hole to be severed; expand accumulator capacity for increased functionality; require real-time monitoring capability for deepwater and high-pressure/high-temperature drilling activities; establish criteria for the testing of subsea well containment equipment in the regulations; increase the reporting of failure data of BOP to OEMs by operators and drilling contractors; adopt criteria for safe drilling margins consistent with Department of Justice and Office of the Inspector General recommendations arising out of the Deepwater Horizon tragedy; require the use of accepted engineering principles and establishes general performance criteria for drilling and completion equipment; establish additional requirements for using ROVs to assist in closing the BOP stack; establish additional guidelines for cementing and the use of centralizers; make the testing frequency of BOPs used on workover operations the same as drilling operations; and, request comments on changing the test frequency for both workover and drilling BOPs from 14 days to 21 days.
Michigan sets new regs for fracking
The Michigan Department of Environmental Quality has announced new requirements that must be met by energy companies that extract natural gas through hydraulic fracturing.