McDermott wins contract on Julia development

McDermott International, Inc. has announced that one of its subsidiaries has been awarded an engineering, procurement and construction (EPC) contract by Exxon Mobil Corporation for its Julia development.
The Julia field is located approximately 265 miles southwest of New Orleans in the Gulf of Mexico Walker Ridge area in water depths of approximately 7,000 feet.
The Julia Phase I project is a subsea tie-back to a semi-submersible floating production unit and the scope includes six subsea wells, one six-slot manifold, two umbilicals, six jumpers, two flowlines with two steel catenary risers, two subsea pump modules and topsides support equipment. Production will flow through two 10-inch production flowlines with subsea single-phase boost pumps. Exxon Mobil Corporation, the operator, and Statoil each hold a 50 per cent interest in the Julia field development.
McDermott will undertake engineering, procurement and construction of the jumpers, four suction piles associated with the manifold, subsea pump, pump transformer and Subsea Distribution Unit/Umbilical Termination Assembly, as well as the transportation and installation of the manifold, suction piles, flying leads, subsea pump system, the power and control umbilicals and SDU/UTAs. McDermott will also carry out testing of the tie-back system and mechanical completion before hand over to the customer.
Previous articleBadger Meter launches SRD, SRI smart valve positio
Next articleSeadrill, SapuraKencana clinch Petrobras contract
Heat Exchanger World Publisher
Heat Exchanger World is a leading international magazine covering all aspects of the product supply chain of heat exchangers. Heat Exchanger World is part of the KCI Group of Companies. We are a leading knowledge, communication and information company connecting business-to-business professionals by building and sustaining global communities, solving their information needs and helping them to develop their professional life and friendships.