TotalEnergies, together with the operator Petrobras and their partners in the Atapu and Sépia consortiums, have taken the Final Investment Decision (FID) for the second development phase of Atapu and Sépia fields, located in the prolific pre-salt Santos Basin, offshore Brazil.
The Atapu field has been producing through the P-70 Floating Production Storage and Offloading (FPSO) unit, with a production capacity of 150,000 barrels of oil per day (bopd). The second development phase, Atapu-2, will comprise a new-built FPSO of 225,000 bopd capacity. TotalEnergies owns an interest of 15% in the Atapu field, in partnership with Petrobras (65.7%, operator), Shell (16.7%), Petrogal (1.7%) and PPSA (0.9%).
The Sépia field has been producing through the Carioca FPSO unit, with a production capacity of 180,000 bopd. The second development phase, Sépia-2, will also comprise a new-built FPSO of 225,000 bopd capacity. TotalEnergies owns an interest of 16.9% in the Sépia field, in partnership with Petrobras (55.3%, operator), Petronas (12.7%), QatarEnergy (12.7%) and Petrogal (2.4%).
The two FPSOs have been designed to minimize greenhouse gas emissions through an all-electric configuration and technologies such as waste heat recovery, closed flare, cargo oil tank gas recovery and variable speed drive for compressors and pumps.
Courtesy of TotalEnergies.