FERC approval for Cameron LNG Liquefaction project

CB&I congratulated Cameron LNG, a subsidiary of Sempra Energy, on receiving authorisation from the Federal Energy Regulatory Commission (FERC) to site, construct and operate a natural gas liquefaction and export facility at the site of the company’s LNG receipt terminal in Hackberry, Louisiana.
The FERC permit is one of the last major regulatory approvals required to start construction on the natural gas liquefaction facility. The authorisation approves the development of the three-train liquefaction facility that will provide an export capability of 12Mt per annum of LNG, or approximately 1.7bcf per day, and will allow CB&I and its joint venture partner, Chiyoda, to access the site and begin construction later this year.
“CC JV, a joint venture contractor of CB&I and Chiyoda International Corporation for the project, congratulates Sempra on this important milestone that brings us one step closer to the start of construction”, said Patrick K. Mullen, president of CB&I’s Engineering, Construction and Maintenance operating group. “Cameron LNG will bring a large number of engineering and construction craft jobs to the Louisiana Gulf Coast, and we are proud to be a part of such an important project.”

Previous articlePump Summit 2014 – Online visitor registration now open
Next articleSubmersible position monitor for hydraulic actuators
Heat Exchanger World Publisher
Heat Exchanger World is a leading international magazine covering all aspects of the product supply chain of heat exchangers. Heat Exchanger World is part of the KCI Group of Companies. We are a leading knowledge, communication and information company connecting business-to-business professionals by building and sustaining global communities, solving their information needs and helping them to develop their professional life and friendships.